Well Drilling Rig Wiki Knowledge

What is the process before drilling?

Before we use water well Drilling Rig to drill a hole, we should do these steps below:

1. Site survey:

Survey the drilling site to understand the topography, geological conditions, the surrounding environment and so on.

2. Determine the well location:

According to the results of the survey, determine the location of the water well to ensure that a suitable location is selected for drilling.

3. equipment preparation:

Check and maintain the drilling rig to ensure that the equipment is in good working condition.

4. Installation of drilling rig:

Install the drilling rig on the selected well location, and stabilize and adjust it.

5. Drilling design:

According to the well location and drilling requirements, make a reasonable drilling design plan, including hole diameter and depth.

6. Setting the wellhead:

Set suitable casing and sealing device at the wellhead to prevent wellhead collapse and groundwater contamination.

7. Drilling preparation:

Prepare the tools, materials and personnel required for drilling, and ensure that safety measures are implemented.

8. Start drilling:

Start the drilling operation according to the drilling design and operating procedures.
Of course, these steps can also be adjusted according to their actual situation.

If you have any other questions about water well drilling rigs or the drilling process, I will be happy to help you.

CONTACT US

Contact: Mr Chen

Phone: +86 18574606855

Tel: +86 746 8323309

Email: pearldrill01@guangzhouintl.com

Add: Shanhuxi Road, Chuangfacheng Plaza, Yongzhou City ,Hunan Province China