What are the operator specifications for water well drilling rigs
Water well Drilling Rig operators to master just far more than the following nine points, the following content only selected key points for our reference, water well drilling rig, we should pay attention to safety in the operation, to avoid accidents, resulting in adverse consequences.
1、Water well drilling rig operation must be completed by personnel who are physically healthy and have the appropriate knowledge and operating license.
2、Water well drilling rig shall not be operated without care.
3、When the water well drilling rig does not use the hydraulic system, the water well drilling rig construction, the water well drilling rig screwing machine switching valve should be placed in the “oil pump unloading” position.
4、When you pull the speed change handle, you must cut off the clutch first, and then change the gear after the gear stops rotating, so as not to break the gear, and pay attention to fix the handle well.
5、When closing the clutch, it should be operated smoothly, and it is forbidden to open and close the clutch violently to avoid the clutch being in half-engaged state.
6、Water well drilling rig move to the front limit position, tighten the front and rear pressure plate lock nut, water well drilling rig price, before allowing drilling or lifting.
7、After the chuck suddenly loses pressure due to accidents (such as loss of power, oil pump not working or other mechanical hydraulic accidents, etc.), the drilling rods or drilling tools should be stuck in time.
8、Operation should always pay attention to the working condition of each pressure gauge, if there is any abnormality, it should be dealt with in time.
9、Often pay attention to whether there is any abnormal ringing or high temperature in each moving part; any problem found should be dealt with immediately.